The biggest cause of kitchen remodel delays isn't construction. It's decisions that weren't made in time. When cabinets, counters, and fixtures are chosen before demolition, the crew can work straight through instead of waiting on orders.
Start with layout. Decide whether the sink, range, and refrigerator are staying where they are or moving. Moving plumbing and gas lines is possible, but it adds cost and time, so it's better to know up front.
Then lock in cabinets and counters. Cabinet lead times can run several weeks, and countertops can't be measured until cabinets are installed. Ordering early keeps those two steps from becoming the bottleneck.
Finally, plan for life without a kitchen. A temporary setup with a microwave, coffee maker, and fridge in another room makes a few weeks of construction much easier. A good contractor will give you a written schedule so you know exactly how long that will be.